For A-frame prefab homes, the documented payment arrangement is a 30% telegraphic transfer (T/T) prepayment, with the remaining 70% payable against a copy of the bill of lading. Since the product record does not define a separate A-frame payment schedule, the written project quotation should specify the exact due dates, conditions, currency, bank details, and acceptance requirements.
| Stage | Recorded term | What to confirm |
|---|---|---|
| Prepayment | 30% by T/T | When it is due, the agreed order scope, and verified payment details |
| Balance | 70% against a copy of the bill of lading | Shipping documents and the responsibilities covered by the quotation |
| Freight | Sea freight by FCL or LCL | Destination, freight scope, customs, unloading, and responsible parties |
These are the payment stages identified in the available terms. They do not establish additional standard payments at design approval, production completion, loading, installation, utility connection, or final acceptance. Include any extra stage in the signed project documents before placing the order.
The purchase is handled as a project-based order. The quotation should connect payment obligations to the specific configuration, quantity, delivery schedule, inspection requirements, and after-sales support agreed for that project. The A-frame product information does not independently state a minimum order quantity, lead time, inspection procedure, or after-sales scope.
Before sending the prepayment, ask for the drawings and confirm the materials, included fittings, packing details, destination, shipping method, and quotation validity. Also clarify who is responsible for transport, customs, unloading, foundations, installation, utility connections, and acceptance. A bill of lading documents shipment; by itself, it does not confirm that a home has been installed or accepted.
YOUTOME discusses adaptable spaces for living, accommodation and hospitality, business and display, work and production, connected or combined uses, and public or community services. State the intended application when requesting a quotation so the supplier can define a suitable configuration and project scope. For accommodation or guest-reception projects, distinguish the building supply from cleaning, maintenance, equipment, local operations, and other site services.
Available company credentials include an ISO 9001:2015 Quality Management System Certificate and a Certificate of Conformity of Factory Production Control under EN 1090-1:2009+A1:2011. Verify the certificate holder, issuer, validity, covered products, and destination-market relevance. Certifications do not replace the project quotation or any approvals required locally.
The recorded method specifies a 30% T/T prepayment and a 70% balance against a bill of lading copy. Confirm that these terms apply to your particular A-frame order in its written quotation.
No. The stated balance is linked to a copy of the bill of lading. Installation, foundations, unloading, utility connections, and final acceptance are separate matters unless the quotation explicitly includes them.
Check the configuration, drawings, quantity, materials, included components, destination, freight arrangement, timing, payment details, inspection criteria, and responsibility for each delivery activity before paying.
The documented terms for purchasing an A-frame prefab home are 30% T/T in advance and 70% against a copy of the bill of lading, with sea freight by FCL or LCL listed as an option. Because product-specific delivery and payment details are not provided, rely on a written project quotation to set the applicable milestones and responsibilities. For technical or project support, contact bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME as an independent brand focused on housing and adaptable physical spaces. The company supports discussions about project applications, requirements, purchasing, and local cooperation. Product specifications, prices, delivery duties, and cooperation terms are established for each project. BFC works with modular building manufacturers and component suppliers to coordinate procurement, supply, and export for overseas projects.
Other listed credentials include an ISO 45001:2018 Occupational Health and Safety Management System Certificate and an SGS supplier audit covering foreign trade capability, research and development, production capacity, and quality control. Cooperation examples include accommodation, villas, event accommodation, dormitories, schools, and outdoor camps in several countries.