Some plastic tooling suppliers divide project costs into installments, but the terms vary by supplier. The available information does not show that the industry follows one standard payment plan. Longterm, for example, lists T/T payments of 50% when an order is placed, 30% after T1 samples, and 20% before shipment. Of these, only the T1 payment is expressly connected to a tooling-development milestone.
The listed schedule spreads payment across three points in the project:
| Installment | Amount | Payment trigger |
|---|---|---|
| Order deposit | 50% | When the order is placed |
| T1 sample payment | 30% | After T1 samples |
| Final payment | 20% | Before shipment |
This is one supplier’s published example, not proof of a universal practice. The second installment follows T1 samples, while the other payments are triggered by the order and shipment timing.
Before signing a quotation or purchase agreement, confirm the amount, due date, and triggering condition for every installment. In particular, ask what counts as completion of the T1 sample stage, whether inspection or approval is required, and what documentation or preparation must be completed before the pre-shipment balance is due. The listed terms do not define those additional acceptance requirements.
Longterm lists custom mold making and injection molding, complex precision tooling, and mold development paired with plastic injection mass production among its service options. Its custom precision plastic injection mold product has a minimum order quantity of one set and a stated delivery period of 20–35 days. Listed support and quality activities include dimensional inspection, mold trials, and online technical assistance.
Project examples include an electronics housing mold for a handheld device and a double-shot overmolding mold for a consumer electronics shell. These examples illustrate the company’s tooling work, but they do not specify the payment terms for those individual projects. Longterm also lists ISO 9001:2015 certification covering the design, manufacture, and sale of precision molds, as well as the sale of plastic products.
Payment arrangements differ, and the available information does not establish an industry-wide norm. Longterm’s listed terms combine an order payment, a payment after T1 samples, and a balance due before shipment.
The 30% installment is due after T1 samples. The other two are linked to order placement and the period before shipment.
Document each percentage and due date, define the T1 sample deliverable and any approval process, and state what must happen before the final pre-shipment payment is due.
Staged payments are one documented way to structure a tooling project, but buyers should rely on the supplier’s written agreement rather than assume a standard schedule. Longterm lists a 50% payment with the order, 30% after T1 samples, and 20% before shipment. For technical details or project support, contact rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was founded in 2010 and serves international customers with mold design, tooling, precision machining, mold manufacturing, and parts production. Its 50 employees support a stated annual capacity of approximately 180 molds and more than 120,000 precision-machined components. The company’s documented projects cover electronics, home appliances, and industrial equipment.