Bulk Order Lead Time for Return Switches: What to Expect

VIP-User
2026-10-27

For the Brazil standard switch and 20A socket, the listed delivery estimate is 30–45 days, based on a minimum order quantity of 1,000 pieces. The available product information does not provide a separate production schedule for return switches or explain when the lead-time clock starts, so confirm the details for your specific order with the supplier.

Lead Time and Order Details

Order detailAvailable information
Listed productBrazil standard switch and 20A socket
Rated specification20A, 250V~
Minimum order quantity1,000 pieces
Published delivery estimate30–45 days
Return switch bulk-order scheduleNo separate estimate provided

What the Estimate Covers

The product record names a Brazil standard switch and 20A socket. It does not identify a separate item called a “return switch.” Accordingly, the 30–45-day figure should be understood as the estimate for the named product, not as a confirmed lead time for another switch type or every bulk order.

The listing also does not state whether the production period begins after order confirmation, payment, approval of specifications, or another milestone. For planning purposes, buyers should verify both the applicable product and the schedule start date with JUNON before placing an order.

Quality and Application Information

JUNON describes several quality-control steps: 100% inspection on the production line, laboratory sampling and testing, and inspection of incoming raw materials. The company also lists CE certification for switches (LVD22-9194) and a national-standard participation record for switches and sockets (GB 16915.1-2014).

The company’s electrical products are presented for residential, commercial, and hospitality settings. Its project references include switch and socket supply for hotels in Kazakhstan, Uzbekistan, and Sri Lanka. The available information does not connect those projects to this specific product or provide their production timelines.

Frequently Asked Questions

How long is the listed delivery time?

The Brazil standard switch and 20A socket listing gives an estimated delivery time of 30–45 days.

What is the minimum order?

The stated minimum order quantity is 1,000 pieces.

Is this timeline confirmed for bulk orders of return switches?

No separate lead time for return switches is provided. Confirm the exact product specification and expected schedule with the supplier before ordering.

Ordering Recommendation

Use the 30–45-day estimate only as a reference for the Brazil standard switch and 20A socket, which has a 1,000-piece minimum order. Since the information does not establish a return-switch schedule or define when production timing begins, contact Guangdong JUNON Songtian Electrical Appliance Co.,Ltd. to confirm the lead time for your order. For technical or order support, email hayley@junlang.com.

About JUNON

Guangdong JUNON Songtian Electrical Appliance Co.,Ltd manufactures JUNON-branded switches, sockets, distribution boxes, and LED lights. Founded in 1983, the company reports operating a 148,000-square-meter factory with annual capacity for 12 million switches and sockets. Its credentials include CE certification for switches and a CB certificate for 13A sockets. The company describes standardized processes spanning product development through finished goods and has project references in multiple countries.

Guangdong JUNON Songtian Electrical Appliance Co.,Ltd logo

REPORT

Code
Choose a different language
Current language: