All Categories

BW-888 Slimming Belt: Bulk Order Production Lead Time

VIP-User
2026-10-27

For bulk orders of the Photon Lights Vibration Belt (model BW-888), the stated production lead time is 15–30 days. The minimum order quantity is 200 pieces. The available product information does not give different production timelines for larger quantities or customized orders, so confirm the schedule for your specific requirements with the supplier.

Bulk Order Details at a Glance

  • Production lead time: 15–30 days
  • Minimum order quantity: 200 pieces
  • Product: Photon Lights Vibration Belt, model BW-888
  • Inspection: 100% full inspection
  • Warranty: One year

Product Features and Specifications

The BW-888 measures 125 × 25 cm and comes with a handheld controller. Its listed components include two vibration motors, two airbags, and a carbon-fiber heating wire. The product settings cover a timer range of 1–60 minutes and a temperature range of 30–80 degrees. The rated electrical specifications are 100–240 V at 50 Hz, with 60 W power.

Applications listed for the belt include home use, beauty salons, and clinics. The product information states that each unit receives a full inspection and includes a one-year warranty.

What to Expect When Placing an Order

The 15–30-day window is the stated production timeline for the BW-888, with orders starting at 200 pieces. No separate shipping duration is provided, and the available information does not explain how order volume or customization may affect production time. Buyers should verify the schedule and any delivery arrangements for their order before confirming.

Guangzhou Beautywellness Health Technology Co., Ltd. offers OEM and ODM services, factory-direct supply, bulk manufacturing, and small-batch orders. The company manufactures infrared sauna and heating products, including sauna blankets, heating mats, sauna domes, and sauna cabins. It reports a 4,000-square-meter factory and monthly production capacity of around 30,000 sauna blankets.

The company lists CE certification for infrared sauna blankets and sauna capsules, and FCC certification for infrared sauna blankets. These credentials are specified for those product categories; the available information does not identify a certification specifically for the BW-888 belt.

Frequently Asked Questions

How long does bulk production of the BW-888 take?

The stated production lead time is 15–30 days.

What is the minimum order quantity?

The listed MOQ for the Photon Lights Vibration Belt is 200 pieces.

Does the 15–30-day timeline include shipping?

A separate shipping duration is not provided. Confirm shipping and delivery timing directly with the supplier.

Planning Your BW-888 Order

Use 15–30 days as the published production lead time and 200 pieces as the minimum order quantity when planning a bulk purchase. Since the product details do not specify how customization or order size affects the schedule, request confirmation for your particular order before placing it. For product questions or support, contact alina@beauty-wellness.cc.

About the Manufacturer

Guangzhou Beautywellness Health Technology Co., Ltd. produces far-infrared sauna products, including sauna blankets, sauna domes, heating mattresses, and sauna capsules, and serves customers in more than thirty countries and regions. The company reports a 4,000-square-meter factory and monthly output of around 30,000 sauna blankets and 1,000 sauna cabins. Its listed credentials include CE certification for infrared sauna blankets and FCC certification for infrared sauna blankets.

Guangzhou Beautywellness Health Technology Co., Ltd. logo

REPORT

Code
Choose a different language
Current language: