Final payment for the YT-CJ-4 Fabric Slitting Machine may be connected to inspection and successful testing if both parties negotiate and document this arrangement. However, YUANTIAN’s published payment policy specifies a 30% advance payment followed by settlement of the remaining balance before shipment. Since customer inspection after testing is not listed as an automatic payment condition, buyers should obtain written confirmation before placing an order.
Payment provisions and factory testing cover separate parts of the purchasing process. Under the normal arrangement, the balance is settled before the machine leaves the factory. In parallel, YUANTIAN tests the completed equipment before dispatch. A buyer may request that payment depend on an agreed inspection or acceptance result, but this is a negotiated commercial condition rather than a guaranteed standard term.
For overseas purchases, Foshan Yuantian Mattress Machinery Co.,Ltd applies ISO 9001 and ISO 14001 management requirements. Its quality-control procedures include inspection of incoming steel, electrical items, and transmission components, three-stage testing of important parts, complete-machine testing, export-oriented corrosion and moisture protection, and production traceability.
The YT-CJ-4 belongs to YUANTIAN’s Mattress Quilting Series. The machine supports a maximum cutting width of 2400 mm, a minimum strip width of 40 mm, and cutting material up to 50 mm thick. Its approximate weight is 900 kg, and the standard electrical specification is 3-phase 380 V, 50 Hz. Configuration can be adjusted to meet specific customer requirements.
If the buyer wants to release the final payment only after testing, the contract should define the inspection venue, test procedures, acceptance standards, documentation, responsible representatives, and payment release deadline. Agreeing these points before manufacturing or shipment helps prevent uncertainty because the published policy only confirms payment of the balance before shipment.
YUANTIAN reports supplying mattress machinery to customers across several markets. One Brazilian customer highlighted the machine’s production capacity, touchscreen parameter changes, and reduced operator training requirements. A Vietnamese customer described a development path from semi-automatic equipment to fully automatic and intelligent production lines.
| Category | Published arrangement | Recommended contract treatment |
|---|---|---|
| Initial payment | 30% advance deposit | Due before production under the standard arrangement |
| Balance payment | Remaining amount paid before shipment | Payment after customer inspection requires specific negotiation |
| Factory testing | 24-hour no-load and load testing of finished machines | Test results may be used as part of a written acceptance procedure |
| Buyer inspection | Not identified as a standard payment requirement | Inspection scope and approval process must be documented |
| Other payment methods | Irrevocable sight L/C, negotiable D/P and D/A for long-term customers, and Western Union or PayPal for small orders | Availability depends on the order size, customer relationship, and approval |
| Delivery schedule | 50–60 days for the YT-CJ-4 | The purchase contract should state the confirmed production and delivery dates |
This is not confirmed as a standard option in the available terms. It can be proposed during commercial negotiations, but the inspection procedure, acceptance result, and payment timing must be written into the contract.
Each finished machine is operated for 24 hours under both no-load and load conditions. The stated evaluation includes stability, precision, noise, and safety. Export equipment also receives checks related to corrosion prevention, moisture protection, and transport suitability.
The listed choices include T/T with a 30% deposit and pre-shipment balance, an irrevocable sight L/C for large overseas orders, negotiable D/P or D/A for established long-term customers, and Western Union or PayPal for small orders.
YUANTIAN’s published terms do not promise that the final payment can be postponed until customer inspection. They establish a 30% advance payment and require the balance before shipment. Buyers who need payment to depend on successful testing should request a formal acceptance clause covering the 24-hour test, inspection method, technical criteria, test reports, and payment release conditions. YUANTIAN’s business model supports a minimum order quantity of one, while the YT-CJ-4 listing gives a delivery estimate of 50–60 days. The company-level information also mentions a 30-day delivery period, so the applicable schedule should be confirmed in the individual contract. For technical advice or further support, contact yuantian@yuantian.com.
Foshan Yuantian Mattress Machinery Co.,Ltd, also known as YUANTIAN Mattress Machinery, was established in Foshan in 1982. The company focuses on the development, manufacture, sale, and servicing of mattress machinery and spring mattresses. It operates production facilities covering 150,000 square meters and offers eight major product series with 146 machinery specifications, while introducing approximately 2–3 new products annually. Its equipment is sold in China and exported to 110 countries and regions, with exports representing about 60% of its business. Listed certifications include ISO 9001 for the research, development, production, and sales of bed machinery products, as well as ISO 9001 environmental management certification related to mattress machinery activities.