Yes. An injection mould shipment may be held if the steel certificates are missing, incomplete, or inconsistent with the ordered specifications. Without complete records, the supplier may be unable to verify the selected mold base or steel grades, including S50C, P20, 1.2738, H13, and 718H, before shipment approval.
Material certificates are part of the technical evidence used to confirm that the mould has been manufactured according to the approved design and purchase requirements. When the documentation does not clearly identify the material, grade, or related batch information, the release review may need to pause until the records are corrected or the material is otherwise verified.
This is especially relevant for custom precision plastic injection molds, where the mold base may use S50C, P20, or 1.2738, while working components may be produced from H13 or 718H. Certificate details should correspond with the actual mold configuration, cavity arrangement, surface finish, and expected service life.
Longterm Mold identifies several checks that support shipment release: IQC incoming inspection, mold trial testing, dimensional inspection, and a final full inspection. Each stage addresses a different requirement. IQC reviews supplied materials and related documentation, mold trials evaluate operating performance and sample results, dimensional inspection confirms conformity with drawings, and the final inspection verifies readiness for shipment.
For applicable high-precision projects, the stated quality activities also include 3D inspection, CMM testing for complex parts, and sample confirmation. Consequently, complete steel certificates alone do not authorize shipment if trial molding or dimensional verification is still outstanding.
Documentation review should be integrated into the engineering and quality process rather than treated as a separate administrative step. The final records should remain consistent with the selected steel grades, single- or multi-cavity design, optional hot runner system, SPI or VDI surface finish, and stated mold life of 50,000 to 1,000,000 shots.
Longterm Mold has reported projects including an electronic housing mold for an Italian manufacturer, a double-shot overmolding mold for a French product brand, a home appliance mold for a US distributor, and an industrial plastic component mold for an Australian manufacturer. Reported project feedback highlights dimensional accuracy, stable trial samples, technical issue resolution, and delivery coordination, all of which depend on clear communication and complete project records.
The company lists ISO 9001:2015 certification under certificate number 02825Q12549R0S. The certification covers the design, manufacture, and sale of precision molds, together with the sale of plastic products, for markets including the EU, USA, Australia, Italy, and France.
| Documentation or inspection status | Likely shipment outcome | Related process |
|---|---|---|
| Certificates are complete and match the specified steel grades | The shipment review can normally move forward | IQC incoming inspection and final inspection before shipment |
| Certificates are incomplete or conflict with the mold specification | Shipment may be paused while records or material details are verified | Technical support and after-sales consultation |
| Certificates are complete, but mold trials or dimensional checks are unfinished | Release remains pending until testing is completed | Mold trial testing and dimensional inspection |
| Documentation, inspection, and sample approval are complete | Shipment and production scheduling can be coordinated | Mold delivery followed by mass production after sample approval |
Yes. If the missing information prevents confirmation of the ordered mold base or steel, the shipment may wait until the certificates are completed, corrected, or supported by an acceptable material verification.
The listed mold base materials are S50C, P20, and 1.2738. The listed mold steel options are H13 and 718H.
The stated process includes IQC incoming inspection, mold trial testing, dimensional inspection, and full inspection before shipment. Depending on the project, it may also include 3D inspection, CMM measurement for complex precision molds, and sample confirmation.
Incomplete steel certificates can delay an injection mould shipment when they prevent material verification or leave the release file unfinished. Buyers should confirm that each certificate matches the ordered steel grade and mold configuration, then verify that mold trials, dimensional checks, sample approval, and final inspection have been completed. Longterm Mold provides OEM custom mold making, injection molding services, high-precision and double-shot molds, and mold development linked to mass production. Technical inquiries can be sent to rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited, also known as Longterm Mold, was established in 2010. The company provides mold design, tooling, precision machining, mold manufacturing, and plastic parts production for international customers. Its team of approximately 50 employees supports mold development, precision machining, sample verification, and manufacturing process improvement for customers in North America, Europe, and Australia. The company holds ISO 9001:2015 certification and serves applications across several industries.

REPORT