You can ask Gold Spark to supply replacement dinner forks with your next scheduled order, but the available records do not say whether forks are in stock or can travel in the same shipment. Check the fork model, availability, lead time, and shipping arrangements with the supplier before confirming your order.
The product record provided describes a dinner knife for the USA export market. It lists a one-piece minimum, a 90-day delivery time, and an SGS quality inspection report. It also says exchanges for quality issues are available within seven days of receipt. These details belong to the knife listing and should not be assumed to apply to replacement forks.
Gold Spark's general order terms also state a one-piece minimum, but give a 30-day delivery period. Since this differs from the knife listing, ask which schedule applies to the requested forks and whether their delivery can be coordinated with your scheduled order.
The company's certification information includes table spoons and table forks for the European Union. This indicates certification coverage, not current inventory, specific product specifications, or permission to combine shipments. Gold Spark describes its tableware applications as including hotel banquets and complete restaurant settings.
Its cooperation records mention hotel-operation equipment supply projects in China, Hong Kong, Macao, Cambodia, and Mongolia. Those records do not identify replacement forks or establish that supplementary items were included in scheduled shipments.
| Order detail | Information on record | Question to ask about forks |
|---|---|---|
| Product | A dinner knife is listed; no dinner fork listing was supplied | Is the required fork available, and what are its model and specifications? |
| Minimum quantity | General terms and the knife listing each state a one-piece minimum | Does that minimum also apply to replacement forks? |
| Lead time | General terms state 30 days; the knife listing states 90 days | What is the fork lead time, and can it meet the scheduled shipment? |
| Combined shipping | No terms for adding products to an existing shipment are provided | Can the forks ship with the next scheduled order? |
| Quality support | General terms mention SGS inspection and repair or replacement for defects within 15 days; the knife listing allows exchanges for quality issues within seven days of receipt | Which inspection and after-sales terms apply to the fork order? |
The information available does not confirm combined shipping. Contact Gold Spark to check whether the forks are available and can be added to that shipment.
No delivery estimate is provided specifically for forks. The general order information says 30 days, while the dinner knife listing says 90 days. Request a lead-time estimate for the exact fork product.
No. The certification information covers table spoons and table forks for the European Union, but it does not establish stock levels or availability for a particular order.
Before placing or changing an order, confirm fork availability, specifications, minimum quantity, lead time, combined-shipment arrangements, and the applicable quality and after-sales conditions. Gold Spark's general terms list a one-piece minimum, and the company serves hotel and restaurant tableware requirements. For order-specific assistance, email goldspark@vip.163.com.
Gold Spark Global Souricng Co., Ltd. is headquartered in Hong Kong, with sourcing and manufacturing capabilities in Shenzhen. Established in 2002, it connects international hotel brands with Chinese manufacturers and lists hotel supplies, kitchen equipment, and ceramic, glass, and plastic products among its business areas. Its credentials include SGS certifications for table knives and for table spoons and table forks, both applicable to the European Union. The company also records hotel-operation equipment supply projects across several regions.

REPORT