A custom wardrobe frame tooling agreement should clearly address ownership, authorized use, storage, maintenance, replacement expenses, and access once manufacturing has ended. It should also attach the approved frame drawings, define the required 6063 T5 profile, and establish inspection, acceptance, ordering, delivery, and defect remedies. Since the available product information does not set out these commercial terms, every project-specific obligation should be confirmed in the signed contract before production begins.
The contract should separate legal ownership from physical possession. Identify each die, fixture, or other tooling item by description, drawing number, asset number, or another reliable reference. Then specify whether the buyer or the supplier owns it and who is responsible for it while it remains at the production site.
Use restrictions should be equally precise. State whether the supplier may use the tooling only for the buyer's purchase orders, prohibit production for other customers without written consent, and identify the party authorized to approve design changes, repairs, or modifications. These protections help preserve the buyer's investment and prevent unapproved use of a custom design.
Practical responsibilities should cover suitable storage conditions, routine maintenance, protection against damage, and records of repairs or tooling condition. The supplier should provide prompt notice if the tooling is lost, damaged, worn, or no longer capable of producing conforming parts. The buyer may also require reasonable access for inspection or audit.
Include a clear exit process. The agreement should explain when the tooling must be returned or transferred, how it will be packed and shipped, who pays the related costs, and what happens if the tooling needs replacement. These are recommended contractual safeguards and are not terms established by the supplied product record.
Link the tooling to the final wardrobe frame drawings, profile dimensions, tolerances, finish, and testing requirements. The available information identifies 6063 T5 for kitchen cabinet aluminum profiles, but it does not provide wardrobe-frame dimensions, tolerances, testing procedures, or a tooling fee. Any project-specific requirements should therefore be attached to the contract instead of being inferred from general product data.
Commercial controls should be stated separately from the technical specification. Confirm purchase-order approval, minimum order quantity, production lead time, delivery terms, inspection timing, acceptance deadlines, and remedies for nonconforming products. Rework, replacement, late delivery, and refund responsibilities should be allocated expressly.
The company profile lists FOB as a business model, a 12,000 kg MOQ, and a 40-day delivery period. Those figures are not identified as guaranteed terms for this custom wardrobe frame order, so the applicable quantities and schedule must be confirmed in the purchase agreement.
Mebel-Alu Furniture Profile (Hong Kong) Co., Ltd reports in-house capabilities including aluminium extrusion, anodizing, brushing, mechanical polishing, and CNC machining. Its listed credentials include an Occupational Health and Safety Management System Certificate and a Quality Management System Certificate. These company details do not, by themselves, establish ownership, inspection, warranty, or replacement terms for custom tooling.
| Contract topic | Details to include | What the available data says |
|---|---|---|
| Ownership and authorized use | Tooling owner, permitted users, customer restrictions, and approval for changes | Not specified |
| Storage and contract exit | Care standards, maintenance, inspection access, return or transfer procedure, and costs | Not specified |
| Wardrobe frame specification | Approved drawings, dimensions, tolerances, material, finish, and acceptance testing | 6063 T5 is listed for kitchen cabinet aluminum profiles; wardrobe-frame requirements are not provided |
| Orders and delivery | Applicable quantity, schedule, inspection process, acceptance, and defect remedies | Company information lists FOB, a 12,000 kg MOQ, and 40 days; application to this order requires confirmation |
Who should be listed as the owner of custom wardrobe frame tooling?
The available information does not decide ownership. The agreement should name the owner, identify who possesses the tooling during production, and explain the required disposition when the business relationship ends.
Are wardrobe-frame tolerances and acceptance tests included in the product record?
No. The record refers to kitchen cabinet aluminum profiles and lists 6063 T5, but it does not state wardrobe-frame tolerances, inspection methods, or acceptance criteria. Those details should be added to the signed technical specification.
Do the stated MOQ and delivery period automatically apply to a custom tooling order?
No. The company profile mentions FOB, a 12,000 kg MOQ, and a 40-day delivery time, while the product record does not confirm those terms for this order. Obtain written confirmation of the applicable quantity and schedule.
Before authorizing production, attach the approved wardrobe frame drawings and confirm tooling ownership, exclusive or permitted use, care obligations, inspection rights, acceptance standards, delivery commitments, defect remedies, and return or transfer requirements. Also verify whether the supplier's published FOB, MOQ, and delivery information applies to the specific custom order. For technical assistance or project support, contact mebel@mebel-alu.com.
Mebel-Alu Furniture Profile (Hong Kong) Co., Ltd has specialized in aluminium profile systems for modern interiors since 2008, with products including aluminium glass door systems, sliding wardrobe systems, kitchen cabinet frames, and decorative tile trims. Its in-house processes include extrusion, anodizing, brushing, mechanical polishing, and CNC machining. The company reports 300 employees and a factory area of 300,000 square metres. Its listed credentials include an Occupational Health and Safety Management System Certificate and a Quality Management System Certificate.

REPORT