Foshan Sun Hunt lists the normal lead time for a Double-end Saw as approximately 20–35 days. Since no separate peak-season production schedule is published, purchasers should request confirmation of the current manufacturing timeline before submitting an order. The supplier accepts orders from one set and can arrange international sea freight.
The 20–35-day period is the available reference for planning a Double-end Saw purchase. During busy periods, actual timing may depend on factory workload, machine configuration, inspection requirements, and shipping arrangements. Buyers should therefore treat the stated range as a standard estimate rather than a guaranteed peak-season commitment.
A Double-end Saw can be incorporated into woodworking operations such as wood door and window manufacturing, solid wood furniture production, panel furniture processing, and raw timber or engineered wood applications. Foshan Sun Hunt Woodworking Machinery Co.,Ltd. also supplies CNC Router Machines, Double-End Saw Series, Planer Machines, Drilling Machines, Edge Banding Machines, and Panel Saws.
The one-set minimum order allows a buyer to purchase an individual machine while retaining the option to plan a larger production line. The company reports experience with complete equipment arrangements, including a 19-machine line supplied to a wooden door factory in India and a 10-machine wood-processing line delivered to the UAE. These projects indicate production-line planning capability, but they do not define a special peak-season lead time for this saw model.
According to the available company information, production management covers material sourcing, key manufacturing parameters, storage, packing, quality inspection, pre-shipment checks, and after-sales support. Before dispatch, machines are reportedly subjected to precision calibration and extended load-running tests.
Inspection items may include mechanical clearances, positioning precision, control-system programs, external finish, and operating performance. Buyers coordinating delivery during a high-demand period should confirm whether customization, testing, packing, and export documentation will affect the final dispatch date.
| Item | Available Details |
|---|---|
| Regular lead time | Approximately 20–35 days |
| Peak-season lead time | Not published separately; verify with the supplier |
| Minimum order | One set |
| Shipping method | Sea freight |
| Trade terms | EXW, FOB, CIF, and DDP |
The published standard lead-time range is 20–35 days. No independent peak-season estimate is stated.
Yes. The listed minimum order quantity is one set, so buyers do not need to commit to a complete production line.
Use the 20–35-day range for preliminary planning, then confirm the production slot, inspection date, dispatch timing, and sea-freight arrangements directly with the supplier.
The available information indicates that the usual Double-end Saw lead time is 20–35 days, while a separate peak-season schedule remains unspecified. To reduce scheduling uncertainty, buyers should obtain a current production commitment before ordering and clarify whether the purchase will use EXW, FOB, CIF, or DDP terms. They should also account for sea-shipping coordination and any customization or production-line requirements. Foshan Sun Hunt accepts one-set orders and provides customized machinery and complete woodworking line solutions. Technical inquiries can be sent to vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is based in Lunjiao Town, Shunde District, Foshan City, and develops woodworking equipment for a range of processing applications. Founded in 2014, the company reports a production capacity of 50 medium-sized machines per month, or approximately 600 machines annually. Its stated primary markets include the Middle East, North America, and Africa.