How Long Does a Standard Mattress Tape Edge Machine Take to Deliver?

VIP-User
2026-11-17

For a standard Double Layer Automatic Tape Edge Machine YT-WB-6, the stated production lead time is 60 days. The minimum order is one machine. This product-specific schedule is longer than Foshan Yuantian Mattress Machinery Co., Ltd.'s general 30-day delivery reference, so buyers should confirm the final timetable according to production capacity, order details, and shipping arrangements.

Lead Time Overview and Main Points

  • The YT-WB-6 Double Layer Automatic Tape Edge Machine has a listed lead time of 60 days.
  • One machine can be ordered, and the equipment is supplied to customers in Asia, Europe, Africa, the Americas, and Oceania.
  • It is intended for high-volume mattress manufacturers, automated production lines, and factory modernization projects.
  • Yuantian supports customers with production planning, equipment installation, commissioning, staff training, and international after-sales service.

Product Specifications and Delivery Considerations

The 60-day schedule applies specifically to the Double Layer Automatic Tape Edge Machine YT-WB-6. The machine is rated to process 160 pieces within 8 hours, uses 13 kW of total power, and accommodates mattress thicknesses from 50 to 450 mm. Its overall dimensions are 22,000 by 4,000 by 1,500 mm, making factory space and layout planning important before shipment.

Double Layer Automatic Mattress Tape Edge Machine YT-WB-6

The company's general 30-day delivery reference describes its wider industry-and-trade business model, whereas the 60-day period is attached to the individual YT-WB-6 product listing. Therefore, buyers planning a standard order should use 60 days as the primary manufacturing estimate and then add transit time based on the destination and selected logistics method.

Before dispatch, Yuantian carries out incoming checks on steel, electrical parts, and transmission components. Important components undergo three-stage testing, and every completed machine receives a 24-hour no-load and loaded operating test. Export orders are also checked for corrosion protection, moisture resistance, and transport suitability, then placed in fumigated wooden packaging to support customs clearance.

YUANTIAN Mattress Tape Edge Machine production equipment

Lead Time and Service Comparison

Planning Category Available Information
Product-specific lead time 60 days for the YT-WB-6 Double Layer Automatic Tape Edge Machine
Company-wide delivery reference 30 days for the broader industry-and-trade operation
Minimum purchase quantity 1 machine
Rated output 160 pieces per 8 hours
Ocean transport FCL or LCL container shipment with fumigated export packaging
Urgent logistics Air freight is available for urgent spare parts and small machines

Frequently Asked Questions

Does the 60-day schedule apply to a single YT-WB-6 machine?

Yes. The product listing specifies a minimum order quantity of one unit and gives a 60-day delivery time for the Double Layer Automatic Tape Edge Machine YT-WB-6.

Why does the machine require more time than the general 30-day reference?

The 30-day period represents a general delivery reference for the company's wider business activities. The 60-day figure is specific to the YT-WB-6 and is the more relevant planning basis for this machine.

What assistance is available during and after delivery?

Yuantian offers factory-layout and capacity advice before purchase, professional installation and commissioning, operator and maintenance training, multilingual manuals, and 24-hour remote assistance. Complete machines also include a one-year free global warranty, excluding wearing parts.

Conclusion and Purchasing Advice

Customers purchasing a standard YT-WB-6 should budget approximately 60 days for production before allowing additional time for ocean, air, land, or multimodal transportation. The equipment can be purchased individually, and available payment methods include T/T, L/C, negotiable D/P and D/A for long-term customers, Western Union, and PayPal for small orders. For technical planning, delivery confirmation, or service assistance, contact yuantian@yuantian.com.

About Foshan Yuantian Mattress Machinery

Foshan Yuantian Mattress Machinery Co.,Ltd, known through the YUANTIAN Mattress Machinery brand, was established in Foshan in 1982. The company focuses on the research, development, manufacturing, sales, and service of mattress machinery and spring mattresses. Its 150,000-square-meter facility produces eight main product series and 146 mattress machinery specifications, with two to three new products introduced annually. Yuantian serves the domestic Chinese market and exports to 110 countries and regions, with exports accounting for 60% of its business. Its certifications include ISO 9001 certificates related to mattress machinery production and associated environmental management.

Foshan Yuantian Mattress Machinery Co.,Ltd logo

REPORT

Code
Choose a different language
Current language: