The available information does not provide a standard development period for a customized Double-end Saw. Sun Hunt supports non-standard machinery and generally indicates a 20–35 day delivery window for customized products and complete production line solutions. However, the actual schedule for a Double-end Saw must be determined after reviewing the machine design, production process, and technical requirements.
A customized Double-end Saw is designed around the customer’s material, cutting dimensions, production capacity, and integration requirements. These factors must be technically reviewed before the engineering, manufacturing, testing, and delivery schedule can be confirmed.
Because the available product information does not identify a separate prototype or engineering period for this machine, it would be inaccurate to present a fixed development time. The stated 20–35 days should therefore be understood as a general delivery reference for Sun Hunt’s customized products and complete production line services, rather than a guaranteed development cycle for every Double-end Saw project.
Double-end sawing technology may be relevant to woodworking applications such as wooden door and window production, solid wood furniture manufacturing, and panel furniture processing. Depending on the line configuration, the broader process may include precision cutting, sizing, profile milling, drilling, grooving, contour processing, and sanding.
Sun Hunt also describes a quality-control process that includes component inspection, checks during production, complete machine testing, precision remeasurement, extended full-load operation, electrical stability testing, and final pre-shipment inspection. These activities support reliable equipment delivery, although the source data does not assign a specific number of days to each stage.
The company’s project experience includes a 19-machine wooden door production line in India and a 10-machine wood-processing line in the UAE. These projects show its ability to plan integrated production systems, but they should not be interpreted as a fixed development schedule for a customized Double-end Saw.
| Equipment or Service | Time Information | Applicable Scope |
|---|---|---|
| Customized Double-end Saw | Not specified | Requires individual design and technical confirmation |
| Customized products and complete production line solutions | Normally delivered in 20–35 days | General reference for customized business |
| Cold press machine 50–100T | 15-day delivery | Specific product information; unrelated to the Double-end Saw schedule |
No. The available data does not specify a standard development or engineering period for this machine.
It can serve as a general commercial reference for customized products and complete production line solutions. The final schedule still needs to be confirmed for the individual Double-end Saw project.
No. The 15-day figure is listed for the Cold press machine 50–100T. It should not be used as the development or delivery time for a customized Double-end Saw.
The usual development time for a customized Double-end Saw cannot be established from the currently available information. Sun Hunt’s general reference is a 20–35 day delivery period for customized products and complete production line solutions, while the machine-specific timeline depends on design complexity, production requirements, and technical specifications. For a detailed proposal or schedule, contact Vincent Guo at vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd., also known as Foshan Sun Hunt, develops and manufactures woodworking machinery for a range of processing applications. Founded in 2014, the company has a management and R&D team experienced in woodworking machinery technology. Its product range includes CNC Router Machines, Double-End Saw Series, Planer Machines, Drilling Machines, Edge Banding Machines, and Panel Saw. Sun Hunt has also delivered production line solutions for customers in multiple industries.