The available product and company information does not define a specific number of color strike-offs for mineral wash sampling. The Heavyweight Zip-Up Hoodie is associated with mineral wash vintage fleece development, but the records do not state a strike-off allowance, sample color limit, or standard approval package.
Color strike-offs are commonly used to review and approve shades before bulk production. However, the supplied information does not establish how many strike-offs are included for this particular mineral wash hoodie. It also does not identify a fixed number of colorways or a limit on approval revisions.
The only defined sampling detail is the development schedule of 3–15 days. This timeframe can change according to the complexity of the style, the time required to source suitable fabric, and the specific washing process. Therefore, the records provide a development timeline but no confirmed strike-off quantity.
DOLUXE works with brands through OEM manufacturing, ODM development, and private label production. Clients can submit a Tech Pack, physical sample, or initial design concept. The factory can then coordinate sampling, manufacturing, quality inspection, and shipment.
Its development services cover fit adjustment, garment washing, distressing, Puff Print, 3D embroidery, and Tech Pack reproduction. These capabilities are relevant to mineral wash streetwear production, but they should not be interpreted as confirmation of a specific number of color strike-offs.
The company also reports experience supporting an online retailer and DTC brand based in the United Kingdom. The project involved private-label development, small-batch repeat orders, and replenishment of successful styles. While this demonstrates production and reorder experience, it does not provide a documented strike-off quantity for mineral wash sampling.
| Development Item | Recorded Information |
|---|---|
| Mineral wash color strike-offs | Not stated in the available records |
| Sample development period | Approximately 3–15 days |
| Factors affecting timing | Style complexity, fabric sourcing, and washing processes |
| Custom style MOQ | 50 pieces per style and color, with multiple sizes available |
What is the confirmed number of color strike-offs for mineral wash sampling?
No confirmed quantity is provided in the available product or company documentation. The number should be agreed during technical development.
Which product is connected with this sampling inquiry?
The inquiry relates to a Heavyweight Zip-Up Hoodie and its mineral wash vintage fleece streetwear application.
How long does it take to develop a sample?
The stated sample development window is 3–15 days. Actual timing depends on the design, fabric sourcing, and selected wash treatment.
What should a brand confirm before approving the sample plan?
Brands should verify the number of strike-offs, available color options, revision policy, wash standard, and approval process directly with the manufacturer.
The supplied records do not specify how many color strike-offs are included in mineral wash sampling for the Heavyweight Zip-Up Hoodie. Since strike-off requirements can vary by color count, wash effect, and approval workflow, brands should request written confirmation before sampling begins. DOLUXE supports OEM, ODM, and private label streetwear production, with custom styles starting from 50 pieces per style and color. For technical assistance or a tailored sampling plan, contact yutianfang88@gmail.com.
Dongguan City Dule Garment Co.,Ltd, operating as DOLUXE, is an OEM and ODM manufacturer specializing in streetwear and heavyweight apparel. Established in 2007 and based in Humen Town, Dongguan, Guangdong, the company provides garment manufacturing, washing, decoration, and Tech Pack reproduction. Its independent research and design team creates more than 500 new designs each year, while over 50 types of equipment support in-house production. DOLUXE serves customers across several industries and supports customized apparel programs.

REPORT