When ordering patio tables and chairs in custom colors, use the product-specific formal-order timeline of 30-45 days as the main planning reference. Sample orders are estimated at 7-10 days. Because the available product information does not identify a separate color-related delay, it is best to approve the color details early and schedule the project within the stated 30-45-day production window.
The furniture combines an aluminum frame with high-density polyester rope weaving. Customization covers both dimensions and color, but the product specifications do not assign an additional production period specifically to color changes. Accordingly, the 30-45-day formal-order lead time should be used when preparing schedules for a customized color selection.

Color requirements should be finalized before production is scheduled. If the shade or finish needs to be evaluated in person, request a sample first and allow 7-10 days for sample preparation. After approval, confirm the selected color, table size, seating capacity, quantity, and any other project specifications before the formal order enters production.
The supplier's quality procedures include incoming raw material inspection, production-stage monitoring, dimensional and visual checks, structural stability testing, quantity confirmation, and packaging inspection. These steps help coordinate a reliable shipment, although the supplied data does not establish a separate buffer for custom colors.
Kingwell provides manufacturer, OEM, ODM, and custom project services. The stated standard order minimum is 5-10 sets, and mixed one-stop production is available. Although the company also presents a general production lead time of 25-30 days, this particular product lists 30-45 days for formal orders. The product-specific range should take priority when preparing a project schedule.
The dining table can be configured for 6, 10, or 12 people. This flexibility makes the set suitable for hospitality and residential outdoor spaces where both capacity and appearance need to match the project design.
| Item | Available Information | Planning Recommendation |
|---|---|---|
| Sample order | 7-10 days | Allow this period when checking a color or finish before production |
| Formal order | 30-45 days | Use this product-specific range for delivery planning |
| Color customization | Available | Approve the color specification before production scheduling |
| Standard order minimum | 5-10 sets | Confirm the required quantity against the project scope |
| Table capacity | 6, 10, or 12 people | Select the appropriate size and seating configuration in advance |
No separate color-specific allowance is provided in the available product data. Use the stated 30-45-day formal-order period and confirm the color before production begins.
The listed sample lead time is 7-10 days. A sample can be useful when the final color needs to be reviewed before committing to a formal order.
Confirm the color, dimensions, seating capacity, order quantity, and any other customization requirements. The table supports configurations for 6, 10, or 12 people, along with customized size and color options.
For custom patio table and chair colors, plan around the product's 30-45-day formal-order lead time instead of adding an unconfirmed fixed number of days. When color accuracy is important, order a sample within the 7-10-day sample timeline, approve the result, and then release the complete configuration for production. Kingwell supports OEM, ODM, manufacturing, and custom project requirements, with inspections carried out throughout production and before shipment. For technical assistance or project support, contact info@kingwellgrou.com.
Foshan Kingwell Industry co..Ltd. supplies outdoor furniture for engineering and hospitality projects, including aluminum and teak collections. Founded in 2015, the company offers design, manufacturing, customization, and sourcing services from a 26,800 sqm factory with a reported monthly capacity of 5,000 pieces. Its listed certifications include EN 581 for outdoor tables and ISO90001 for outdoor furniture, and its project experience covers clients in several international markets.

REPORT