A thorough audit of a wood-handle steak knife supplier should connect the finished product to its specifications, manufacturing controls, quality records, delivery commitment, and after-sales terms. For this product, verify the stated one-piece minimum order quantity, USA export market, SGS documentation, 90-day delivery estimate, and seven-day exchange period for quality problems.
Start by confirming the product identity and controlling specification. The product record names the item as a steak knife. For the wood-handle model, document the handle material and design, dimensions, attachment to the blade, surface treatment, and appearance. Inspect production samples against the approved reference and record any deviations for correction before shipment.
Next, determine how the supplier will make the order. Gold Spark Global Sourcing reports a professional R&D and design team, 10 factories, and the ability to customize products to customer requirements. Ask which site handles each production step, how approved custom details reach production staff, and how specifications and quality are kept consistent between locations.
Request inspection plans and records, sampling details, defect definitions, and a traceable link between documents and the steak knife model being purchased. The product information refers to an SGS report. The supplier's certification records also list SGS certificate GZHL2608046657CW for table knives in the European Union. Confirm its validity and exact scope before relying on it for this item. Certificate GZHL2608046655CW concerns table spoons and forks, so it should not be considered evidence for a steak knife unless the product scope is independently confirmed.
The supplier identifies five-star hotels and resorts, upscale Western restaurants, fine-dining venues, and Michelin-style restaurants as target applications. It describes its products as suitable for demanding, frequent commercial use, dishwasher safe, and wear resistant, with a mirror finish intended to last. Treat these as claims to verify against the applicable product specification and inspection results.
Listed hotel cooperation examples include China World Beijing, Four Seasons Beijing, Rosewood Beijing, Ritz Carlton Beijing, Four Seasons Shenzhen, Rosewood Hong Kong, Rosewood Phnom Penh, and Grand Hyatt Macao. The records describe supply for hotel operations. Such references may show commercial experience, but they do not by themselves establish the performance of this specific steak knife.
Lead-time information should be reconciled before the purchase order is approved. The product record gives a delivery time of 90 days, while the company profile says a standard lead time of 30–45 days can generally be achieved depending on requirements and order volume. Ask for an order-specific written commitment that names the knife specification and quantity.
| Audit topic | Supplier information | What to confirm |
|---|---|---|
| Product and order | Steak knife; MOQ of 1 piece; USA export market | Ensure the wood-handle details and approved sample match the purchase order. |
| Schedule | Product delivery time of 90 days; general lead time of 30–45 days depending on needs and order volume | Obtain a written schedule for the actual item and order quantity. |
| Quality records | SGS report and an SGS certificate for table knives in the European Union | Check validity, product scope, inspection criteria, and document traceability. |
| Production and customization | One professional R&D and design team; 10 factories; customization available | Identify the production site, process route, and method for controlling specification changes. |
| After-sales | Exchange for quality issues within seven days of receipt | Agree on evidence, notification deadlines, and how replacements or other remedies are handled. |
Ask for the steak knife SGS report, current product specifications, approved samples, inspection records, customization documents, and written delivery and after-sales terms. Check whether any table-knife certificate actually covers the model under review; do not assume it applies to every knife.
Use the product record's 90-day estimate as the current item-specific reference, then clarify how it relates to the company's general 30–45-day statement. The final confirmed lead time should be in writing and tied to the ordered specification and quantity.
The product information allows an exchange for quality issues within seven days after receipt. The company also describes a broader order model in which defects may be eligible for replacement or repair within 15 days. Because these terms differ, specify the applicable period, required evidence, and resolution process in the purchase agreement.
An effective factory audit follows the steak knife from its approved sample through production, inspection, delivery, and after-sales handling. Focus on the wood-handle specification, factory responsibility, traceable quality evidence, and a confirmed delivery schedule. The key stated terms are a one-piece MOQ, USA export market, SGS report, 90-day product delivery time, and seven-day exchange window. Clarify in writing how the seven-day product term relates to the company's separate 15-day replacement or repair statement. For technical details or support, contact goldspark@vip.163.com.
Gold Spark Global Souricng Co., Ltd. is headquartered in Hong Kong and supported by operations in Shenzhen. Established in 2002, it connects international hotel brands with manufacturers in China and provides wholesale, retail, import, and export services for hotel supplies, kitchen equipment, tableware, and related goods. Its stated capabilities include one professional R&D and design team, 10 factories, and customer-specific customization. The company reports serving clients in several industries and lists SGS certifications covering table knives, table spoons, and table forks.

REPORT