Before committing to a high-volume front fender order, confirm that the factory can meet your quantity and delivery dates while maintaining consistent quality. Review production availability, fender-specific inspection and fitment evidence, destination-market documents, and the controls used before shipment. Treat capacity figures as claims to verify against current schedules and records.
Ask the factory how many production lines are available, what workload they are currently handling, and how output will be scheduled as your order grows. Danyang Wanjiang reports annual capacity of hundreds of containers, monthly exports of more than 50 standard containers, and year-on-year production expansion of 40%. These are company-reported figures. Confirm the capacity reserved for your order and ask for a schedule that accounts for current commitments.
Then review quality controls across the production cycle. The company describes checks on raw materials for strength and impact resistance, monitoring of molds and molding processes, and a 100% final inspection before loading. Ask for records identifying the relevant fender and order, including the dimensional and fitment checks planned for the vehicle series you require. The provided product information names visual inspection, CMM measurement, and paint and coating tests for side mirrors; it does not confirm that these methods are applied to front fenders.
Request fitment evidence for the exact vehicle series and confirm which destination-market documents apply to the fender. The company profile lists CE certification HK0624090150C for car bumpers and EPR registration DE1123252940071 covering bumpers, lamps, hoods, fenders, and grilles. Although the profile also refers to CE/DOT standards, the supplied certification records do not include a DOT certificate. Ask for documentation applicable to the specific product and market rather than relying on general compliance statements.
Delivery estimates depend on whether the goods are in stock or made to order. The company states that standard stock products can be loaded within one week. OEM/ODM lead times vary with mold development, process complexity, and order quantity. For a larger purchase, confirm stock, production stages, inspection dates, and shipping milestones in writing.
Danyang Wanjiang describes supplying aftermarket businesses in North America and Europe, including wholesalers, distributors, collision-repair chains, and cross-border sellers. It also reports repeat supply of body parts and offers pre-shipment photos or videos. Use these details to request relevant references or inspection examples, while still evaluating the fender order on its own evidence.
| Area | What to request | Information reported by the company |
|---|---|---|
| Production capacity | Available capacity for your order, current workload, and a production schedule | Annual capacity of hundreds of containers and exports exceeding 50 standard containers per month |
| Quality assurance | Material verification, process-control records, and order-linked final inspection results | Material checks, process monitoring, and 100% inspection before loading are described |
| Fitment and compliance | Vehicle-series fitment evidence and documents relevant to the fender and destination | CE and EPR records are listed for specified product categories; no DOT certificate appears in the supplied records |
| Delivery readiness | Written lead time, stock confirmation, and shipping milestones | Loading within one week is stated for standard stock; customized schedules depend on project requirements |
Review the production plan and inspection records for the proposed volume. Confirm that material checks, process monitoring, and final inspection remain defined as output increases.
No. The detailed inspection methods provided relate to side mirrors. Ask the factory to document the inspection procedures it will use for your front fender order.
Distinguish ready-stock supply from OEM/ODM production. The company reports one-week loading for standard stock, while customized timing depends on mold creation, process complexity, and order volume. Obtain a written schedule for your specific requirements.
Verify the production capacity allocated to your purchase, obtain fender-specific fitment and quality records, and check the documents required in your destination market. Put inspection dates, delivery milestones, and remedies for manufacturing defects in writing. The company describes wholesale stock supply, OEM/ODM customization, and shipping-agent services, and states an MOQ of 1–5 pieces across its business model. For technical questions or support, contact sales01@cnkebel.com.
Danyang Wanjiang Auto Parts Co., Ltd. is an auto body parts manufacturer based in Danyang, Jiangsu Province. It specializes in car bumpers and also supplies grilles, headlights, engine hoods, and fenders. The company reports a 10,000-square-meter factory and annual capacity of hundreds of containers. Its listed credentials include CE certification for car bumpers and EPR registration covering fenders and other body parts; it also describes partnerships with overseas aftermarket businesses.

REPORT