A clear K-House payment plan should follow measurable stages in the manufacturing process. A practical arrangement is to pay 50% upfront when the order is confirmed, allowing the factory to reserve capacity and start production. The remaining 50% is settled before shipment once manufacturing, factory self-inspection, and loading readiness have been verified.
The first payment serves as the production-release milestone. After the 50% deposit is received, the supplier can confirm the selected specifications, schedule the order, and begin manufacturing. This approach gives both parties a defined starting point and connects the initial cash outlay with a specific commercial action.
The second payment is linked to completion and dispatch preparation. The outstanding 50% should be paid in full before shipment after the units are finished, the factory has completed its stated self-inspection, and the products are confirmed ready for loading. The agreement should clearly state that shipment readiness, rather than an unspecified future event, triggers the final payment.
Payment milestones should be listed separately from delivery timing. The order documents should identify the expected delivery period, selected product configuration, inspection arrangement, loading status, and planned shipping container. Available shipping information refers to 40HQ and 20FT ocean freight containers, so the applicable container format should be confirmed before the order is finalized.
There are two recorded delivery schedules that may apply. The industry-trade integration model indicates a 15-day delivery period, while the detachable container house product record states 7 days. The final contract should use the schedule that matches the chosen product, quantity, configuration, and production arrangement.

For projects involving several units, the same 50% deposit and 50% pre-shipment balance can be applied to the complete order. If the supplier agrees to manufacture or deliver in batches, the contract should expressly describe the payment and inspection rules for each batch. Batch terms should not be assumed because the recorded payment arrangement specifies a deposit and a final balance for the order.
This structure is suitable for construction worker accommodation, site offices, remote project camps, emergency housing after disasters, temporary facilities, cultural tourism projects, and rural housing. Since prefabricated units are designed for fast assembly and, in some cases, relocation, coordinating production completion with shipment readiness helps project managers plan installation and site preparation.
Guangdong Uni-House Technology Co., Ltd. holds CE certification No. 3N240819.GUTQO66. The certification is identified for the EU, Australia, North America, South America, Southeast Asia, and the Middle East, and covers modular container house products such as detachable and flat pack containers.
The company has also supplied an Indonesian local energy company for a coal mine living-area project involving 2,000 sets of dormitories for mining workers. This example reflects experience with high-volume prefabricated housing procurement and deployment.
| Item | Applicable term |
|---|---|
| Order deposit | 50% paid in advance to confirm the order and authorize production. |
| Pre-shipment balance | 50% paid in full after production, factory self-inspection, and loading readiness are confirmed. |
| Integration-model delivery period | 15 days. |
| Detachable container house delivery period | 7 days according to the product record. |
| Minimum order quantity | 1 set. |
| Inspection method | Factory self-inspection for the detachable container house product. |
| Ocean freight options | 40HQ or 20FT containers. |
| Warranty | One year for the detachable container house, excluding man-made damage. |
The recorded terms call for a 50% advance payment. This amount should be associated with order confirmation, production scheduling, and the release of the manufacturing process.
The remaining 50% is due before shipment after the units are completed, the applicable factory self-inspection has been performed, and the supplier confirms that the products are ready for loading.
The applicable delivery period depends on the product and commercial agreement. Because the available records list both 7 days and 15 days, the parties should reconcile the difference and record one confirmed schedule in the order documents.
A two-stage arrangement of 50% upfront and 50% before shipment provides a straightforward way to match K-House payments with manufacturing progress. The purchase agreement should define the production-release date, completion status, self-inspection, shipment readiness, delivery period, container type, minimum order quantity, and warranty coverage. The available business model supports orders from 1 set, while the detachable container house record specifies a one-year warranty excluding man-made damage. For technical solutions or project support, contact guizugroup@outlook.com.
Guangdong Uni-House Technology Co., Ltd. is a foreign trade company established under the Guizu Group. It provides design, research and development, manufacturing, installation, and after-sales services through multiple factories. Founded in 2008, the company reports a 100% export ratio and serves customers in Australia, the Middle East, North America, Southeast Asia, and other markets. Its product portfolio includes detachable, expandable, foldable, prefab K, and flat pack container houses, together with space capsule houses.
The company holds CE certification No. 3N240819.GUTQO66 and has worked with clients across a range of industries and project types.