Seasonal demand can make delivery dates less predictable, so plan your Double-end Saw order around a confirmed production schedule rather than a general estimate. Share the exact machine requirements and destination with the supplier, then obtain written confirmation of the lead time, inspection plan, and shipping responsibilities before production starts.
Foshan Sun Hunt lists a normal delivery time of 20–35 days for business orders. This is a general reference, not a guaranteed lead time for every Double-end Saw configuration or a commitment for peak-season orders. Ask the supplier to confirm the schedule for your specific machine, order quantity, and requested delivery window.
Make clear whether you need a standard model or a customized configuration. The company accepts non-standard custom orders and provides production-line solutions, but changes to the scope may affect planning. Confirm the final specifications and production slot in writing, including expected inspection and dispatch dates.
Agree on the pre-shipment inspection (PSI) requirements before the machine is ready. Foshan Sun Hunt describes checks of the machine, spare parts, consumables, tools, appearance, packaging, and documents against the order. A shared checklist and an agreed inspection date can help identify missing items or documentation issues before container loading.
Include export preparation and transit in the delivery plan. The company ships by sea and describes reinforced wooden-case packaging for export. It lists EXW, FOB, CIF, and DDP terms, so clarify who will arrange freight, handle customs-related steps, and manage delivery at the destination. Confirming these responsibilities early can reduce avoidable dispatch and handover delays.
Foshan Sun Hunt Machinery Co., Ltd. is based in Lunjiao, Shunde District, Foshan. The company reports a 2,000-square-meter factory and an annual capacity of 600 medium-sized machines. Its management framework covers source control, production parameters, warehousing, packaging, quality control, pre-shipment inspection, and after-sales support.
The company also reports project experience in India and the UAE, including a 19-machine wooden-door factory production line in India and a 10-machine wood-processing line in the UAE. These examples provide background on its project work, but they do not establish the lead time or seasonal capacity for a particular Double-end Saw order.
| Planning area | Available information | Recommended step |
|---|---|---|
| Lead time | Normal business-order delivery is listed as 20–35 days | Request a written estimate for the exact model, configuration, and order period. |
| Customization | Non-standard products and production-line solutions are available | Finalize the scope and ask how customization affects the production schedule. |
| Pre-shipment inspection | Checks include order items, appearance, packaging, and documentation | Agree on the checklist and resolve discrepancies before loading. |
| Transport | Sea freight and EXW, FOB, CIF, and DDP terms are listed | Document the trade term, freight plan, destination responsibilities, and dispatch date. |
No universal lead time for every Double-end Saw configuration or busy-season order is specified. Treat 20–35 days as a general business-order reference and request a written estimate for your own order.
Confirm the machine specifications, quantity, customization, production and delivery schedule, inspection scope, packaging, shipping term, and payment arrangement. The company lists T/T and L/C at sight; its payment description also refers to a 30% T/T deposit and a 70% balance before loading.
An agreed inspection can help uncover product, packaging, or document issues before loading. The company describes a final PSI before container stuffing, so establish inspection readiness and transport responsibilities well ahead of dispatch.
To manage seasonal delivery risk, provide complete order details early and obtain written confirmation of the production slot and configuration-specific lead time. Set the PSI checklist, packaging standard, shipping term, and dispatch responsibilities before production is complete. Do not treat the stated 20–35-day timeframe as a seasonal guarantee. For technical scheduling or order assistance, contact Vincent Guo at vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. develops and manufactures woodworking machinery in Lunjiao Town, Shunde District, Foshan. The company reports an experienced management and R&D team, a 2,000-square-meter factory, and annual capacity of 600 medium-sized machines. Its project references include wood-door and wood-processing production lines in India and the UAE.