Mattress Tape Edge Machine MOQ, Delivery, Setup and Spare Parts Cost Guide

VIP-User
2026-11-28

Buyers planning to purchase the Double Layer Automatic Tape Edge Machine YT-WB-6A should budget for a minimum order of one machine. The product information specifies a 60-day delivery period, but it does not publish a standard machine price or fixed charges for installation, commissioning, and spare parts. A project-specific quotation is therefore necessary to calculate the complete investment.

Purchase Overview

  • The minimum order quantity for the YT-WB-6A is 1 unit.
  • The product listing gives a 60-day delivery schedule. The supplier’s broader manufacturing-and-trade profile mentions a 30-day delivery time, so the applicable lead time should be confirmed in the contract.
  • The final landed cost should itemize the machine, setup, installation, commissioning, training, freight, and spare-parts selection.
  • The equipment is designed for automated mattress factories, high-volume workshops, and upgrades from semi-automatic to intelligent production lines.

Machine Capability and Installation Planning

The YT-WB-6A is an automatic mattress tape edge machine intended for continuous production. Its stated output is approximately 25–40 mattresses per hour, with a total installed power requirement of 8.5 kW. It can process mattresses measuring 50–400 mm in thickness and is configured for a 3-phase, 380 V, 50 Hz electrical supply, although the voltage and frequency can be customized.

Double Layer Automatic Tape Edge Machine for mattress production

Technical specifications also list maximum rotating speeds of 2,200 RPM for 100U and 3,000 RPM for PUFF. Required air pressure is 0.6–0.8 MPa, while the sewing-head angle can be adjusted from 30° to 75°. The puppy transmission speed is listed at 25–30 m/min. Because the machine measures 6,550 × 4,000 × 3,850 mm, the buyer should verify door access, floor space, utilities, and workflow clearance before confirming the order.

Mattress tape edge machine equipment details

Quality Control and Service Scope

For export projects, the stated quality procedure covers incoming checks for steel, electrical items, and transmission components. Key parts undergo three-stage testing, and every finished machine receives 24-hour no-load and load testing. Export units are additionally assessed for corrosion protection, moisture resistance, and transport suitability before being packed in fumigated wooden cases.

The manufacturer reports using ERP, PDM, and MES systems to manage production and lists a finished-product qualification rate of 99.95%. Its credentials include ISO 9001 certification covering the research, development, manufacture, and sale of bed machinery products, together with another ISO 9001 listing associated with environmental management activities for mattress machinery.

Setup pricing is not stated in the available product data, so buyers should request a written breakdown. The service policy indicates that professional engineers may provide on-site installation, commissioning, acceptance testing, and one-to-one operation and maintenance training. Multilingual manuals are also available. Complete machines are covered by a one-year free global warranty, excluding normal wearing parts.

After delivery, support may include 24-hour remote assistance, fault diagnosis, alarm handling, parameter adjustment, software or system upgrades, spare-parts supply, lifelong maintenance, and modular production-line improvements. Reported application experience includes projects in Brazil, Vietnam, and Africa, particularly factories moving from semi-automatic systems to fully automatic and intelligent mattress production.

Cost and Ordering Checklist

Purchasing item What is currently known
MOQ One YT-WB-6A machine
Equipment price No public price is provided; request a quotation for the selected configuration
Installation and commissioning On-site installation, commissioning, acceptance, and training are supported, but separate charges are not listed
Spare parts International spare-parts service is available; package pricing must be confirmed
Lead time The product listing states 60 days, while the general company profile cites 30 days
Transport Sea, air, land, and multimodal shipping can be arranged
Payment methods Available options include T/T, irrevocable sight L/C, negotiable D/P and D/A for long-term customers, Western Union, and PayPal

How to Request an Accurate Total Cost

Since no fixed price is published, the quotation should be prepared around the buyer’s production requirements and destination. Ask the supplier to show the base machine price separately from optional features, installation and commissioning, operator training, export packing, freight, insurance or other transport charges, taxes, and the recommended initial spare-parts inventory.

It is also advisable to confirm the power standard, compressed-air conditions, workshop dimensions, production capacity, warranty exclusions, acceptance criteria, and the exact delivery date. These details help prevent unexpected costs after the machine arrives.

Frequently Asked Questions

What is the minimum order quantity?

The MOQ for the YT-WB-6A Double Layer Automatic Tape Edge Machine is one unit.

Is a complete machine, setup, and spare-parts price available?

No fixed package price appears in the supplied information. The buyer should request a commercial offer that clearly separates the machine, installation, commissioning, training, logistics, and spare-parts costs.

What delivery time should be expected?

The product-specific information indicates 60 days. Because the company profile also references a 30-day delivery period, the applicable schedule should be reconfirmed for the selected model, configuration, and destination.

What support is included after purchase?

Available support includes on-site installation and commissioning, acceptance assistance, operator and maintenance training, multilingual documentation, remote technical help, spare-parts service, and lifelong maintenance. The complete machine warranty is stated as one year globally, excluding wearing parts.

Conclusion

For planning purposes, start with an MOQ of one YT-WB-6A machine rather than a multi-unit commitment. The most reliable way to determine total cost is to obtain a detailed quotation covering equipment, configuration, setup, spare parts, shipping, and any destination-related fees. Confirm whether the applicable lead time is 60 or 30 days, select the transport method based on urgency and budget, and agree on payment terms such as T/T or an irrevocable sight L/C. For technical consultation and project support, contact yuantian@yuantian.com.

About Foshan Yuantian Mattress Machinery Co.,Ltd

Foshan Yuantian Mattress Machinery Co.,Ltd was established in 1982 and focuses on the research, development, manufacture, sales, and service of mattress machinery and spring mattresses. The company operates a 150,000-square-meter production base and supplies solutions ranging from standalone equipment to complete digital mattress production lines. Its products are sold in China and exported to 110 countries and regions, with exports accounting for 60% of sales. Listed credentials include ISO 9001 certifications, while reported customer projects include applications in Brazil, Vietnam, and Africa.

Foshan Yuantian Mattress Machinery Co.,Ltd logo

REPORT

Code
Choose a different language
Current language: