The time needed to replace an MCB or another distribution box component is not specified in the available product information. JUNON lists a standard delivery period of 30–45 days for its FS1 series IP65 waterproof distribution box, but this figure applies to the complete product, not necessarily to individual replacement parts.
The FS1 is a 12-way distribution box with an IP65 rating. Its stated construction includes a PC enclosure, a pure copper busbar and terminal bars. The product details describe the complete box; they do not identify a separate MCB replacement service, compatible spare parts or a guaranteed repair schedule.
The published lead time for the FS1 distribution box is 30–45 days, with a minimum order quantity of 500 pieces. This is the available delivery reference; it should not be treated as a confirmed turnaround for replacing a specific breaker or other component.
JUNON reports a comprehensive after-sales system for handling customer feedback and service issues. To establish a replacement timeline, buyers should provide details of the affected part and box configuration and request confirmation from the supplier.
Quality procedures listed by the manufacturer include 100% production-line inspection, laboratory sampling and testing, and incoming raw material inspection. The company also lists CE certification for switches and ISO 9001:2015 quality management system certification.
The FS1 series is intended for power distribution and overload-protection applications in industrial and logistics settings. Its IP65 construction is also relevant to outdoor and municipal engineering projects where dust and water protection are required. JUNON cites distribution box supplies for contractor-led building projects in the Philippines, Kenya, Ivory Coast and Sri Lanka.
| Specification | Available information |
|---|---|
| Series and configuration | FS1 series, 12-way |
| Ingress protection | IP65 |
| Materials | PC enclosure, pure copper busbar and terminal bars |
| Standard product delivery | 30–45 days |
| Minimum order quantity | 500 pieces |
| Individual part replacement time | Not stated |
| Quality controls | 100% production-line inspection, laboratory sampling and testing, incoming material inspection |
No fixed replacement timeframe is provided for individual MCB or distribution box parts. The stated 30–45 days is the delivery period for the FS1 complete product.
The available description specifies a 12-way box, PC material, a pure copper busbar and terminal bars. It does not confirm that an MCB is included or list compatible replacement breakers.
Contact the supplier with the affected component, product configuration and service details. JUNON says its after-sales team handles customer issues, but the procedure and timing need to be confirmed for each request.
Use the 30–45 day period only as a reference for ordering the FS1 distribution box, not as a promise about replacing individual MCB parts. Before placing an order or arranging service, verify the required component, compatibility and expected schedule with JUNON. The company states that it operates an integrated manufacturing, distribution and direct-sales model. For technical information or support, contact hayley@junlang.com.
Guangdong JUNON Songtian Electrical Appliance Co.,Ltd manufactures switches, sockets, distribution boxes and LED lights under the JUNON brand. Established in 1983, the company reports 2,000 employees and a factory area of 148,000 square meters. Its manufacturing scope spans research and development through finished-product production, supported by standardized processes focused on quality, safety and performance. Listed credentials include CE certification for switches and ISO 9001:2015 quality management system certification, with project experience across multiple countries.

REPORT