Split delivery dates may be possible for a multi-unit container house project, but they should be treated as a project-specific requirement rather than an automatically included service. The final quotation should clearly state the number of units in each shipment, their configuration, production timing, transport plan, and the responsibilities assigned to every party.
When preparing the project brief, divide the order into proposed delivery groups and provide the preferred arrival date for each group. Include the destination country and city, intended use, site conditions, access limitations, utility information, unit models, layout requirements, and any available drawings or site photographs. If some information is not yet known, identify it as pending instead of making assumptions.
Split deliveries depend on the actual order volume, specifications, manufacturing capacity, and transport arrangements. BFC coordinates procurement, export, and supply through modular-building manufacturers and component suppliers, but the available information does not establish a universal split-delivery option or a fixed lead time for every project.
The responsible project parties should therefore verify production capacity and scheduling with the relevant manufacturing partners. The proposal should distinguish between delivery to a port, arrival at the project site, installation, utility connection, and acceptance. Each shipment may require its own packing schedule, freight booking, customs process, unloading plan, and installation milestone.
Submit a complete project enquiry showing the desired delivery sequence and timing for each unit group. Once the quantities, designs, site conditions, and logistics responsibilities are confirmed, the supplier can assess whether the requested schedule is workable and include the agreed milestones in the written quotation.