If a delivered Double-end Saw appears defective, treat the disagreement as both a technical review and a commercial matter. Record the problem, check the machine against the purchase order, and notify the supplier in writing. Before settling a disputed balance, agree on a documented corrective action that fits the contract and the verified fault.
Collect dated photos and videos, inspection notes, operating conditions, test results, and details of the affected components. Include the machine serial number or order reference, delivery and shipping records, payment documents, and all relevant correspondence. Describe when the issue first appeared and whether the machine was installed and operated according to the supplier's instructions.
Next, compare the delivered machine, accessories, spare parts, documents, and stated performance with the purchase order and agreed specifications. Ask the supplier to review the applicable factory quality-control records and Pre-Shipment Inspection (PSI) results. If damage may have occurred in transit, preserve packaging and container evidence and review handling records.
Foshan Sun Hunt Woodworking Machinery Co., Ltd. describes a seven-part production and service framework that includes source control, production parameters, warehousing, packaging, QC inspection, PSI, and after-sales service. For the machine in question, request relevant records such as component inspections, assembly checks, operational tests, packaging verification, and the final shipment checklist.
The company's stated QC checks include spare-part dimensional, material, and performance reviews; process rechecks; no-load operation; extended full-load running; precision measurements; noise and vibration checks; and electrical stability testing. These records may help assess whether the issue is linked to manufacturing, shipping, installation, operation, or subsequent maintenance.
Once the fault is assessed, put the proposed remedy in writing. Depending on the findings and contract, options may include remote troubleshooting, installation guidance, replacement parts, repair, technical support, or another mutually accepted commercial arrangement. The company's service information also describes machine modifications, function upgrades, and control-system optimization. Engineer visits may be available, but the stated customer-paid costs for overseas dispatch include travel, accommodation, meals, visa fees, and daily technical service fees.
| Review Area | Recommended Action |
|---|---|
| Defect details | Send a precise fault description supported by dated photos, videos, inspection notes, and test results. |
| Order requirements | Check the machine, accessories, consumables, tools, packaging, and documents against the purchase order and shipment list. |
| Factory inspection | Request relevant QC and PSI records, including running, precision, electrical, and packaging checks. |
| Technical support | Discuss remote diagnosis, installation assistance, spare-parts supply, or an engineer visit as appropriate. |
| Payment terms | Review the signed contract and agreed payment schedule. Listed methods include T/T and L/C at sight; listed trade terms include EXW, FOB, CIF, and DDP. |
| Transport condition | For suspected transit damage, retain packaging evidence and check container, moisture, impact, and handling records. The supplied shipping information lists sea transport. |
Do not assume that a defect automatically changes the payment obligations. Check the contract, inspection terms, delivery status, and payment schedule, then notify the supplier in writing of the disputed amount and supporting evidence. Keep payment and order records, and document any agreement on withholding, adjustment, or release of the balance.
First review the applicable contract and payment terms. Tell the supplier in writing which amount is disputed, explain the documented defect, and retain all related records. Consider professional advice if the contract or applicable law is unclear.
Send the order and machine references, a clear description of the fault, photos or videos, operating conditions, test results, packaging observations, and the corrective action you are requesting.
The stated services include remote video or voice diagnosis, installation tutorials, ongoing technical assistance, spare parts after fault confirmation, engineer arrangements in certain regions, and technical solutions for modifications or control-system optimization. Confirm the appropriate response and any related costs in writing.
Resolve a Double-end Saw payment dispute through a clear record of the fault, the order requirements, and the proposed correction. Request the relevant QC and PSI documents, investigate possible transport or installation factors, and agree on the remedy and payment treatment in writing before closing the matter.
Foshan Sun Hunt states that it supplies customized machinery and complete production-line solutions, with a minimum order of one set and a typical delivery period of 20 to 35 days. For technical assistance or a proposed solution, contact vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co., Ltd., also known as Foshan Sun Hunt and Sheng Heng or Sun Hunt, is located in Lunjiao Town, Shunde District, Foshan City. Established in 2014, the company develops and manufactures woodworking machinery for different processing needs. It describes a management system spanning sourcing, production control, warehousing, packaging, QC, PSI, and after-sales service, and reports serving customers in the Middle East, North America, Africa, and other markets.

REPORT