For a Double-end Saw order, the available payment terms indicate a 30% deposit by T/T, with the remaining 70% due by T/T before loading. This is a reference payment structure, not a product-specific quotation or a separately confirmed production-start requirement. Before manufacturing begins, agree on the order price, payment dates, and delivery terms in writing.

Payment Terms and Key Points

  • The stated T/T schedule is 30% upfront and 70% before loading.
  • Because no Double-end Saw price is provided, the deposit amount in currency depends on the agreed order total.
  • Company-wide business information lists a one-set minimum order and a usual delivery window of 20–35 days. Confirm whether these apply to the selected saw and configuration.
  • The company serves woodworking sectors such as panel furniture and wood door production; these applications do not confirm that a particular saw setup will meet a buyer’s requirements.

What to Confirm Before Production

The payment information describes a 30% deposit followed by a 70% balance payment before loading. It does not specify the exact event that makes the deposit payable—for example, contract signing or order confirmation. Set out that trigger and each payment milestone in the sales contract.

There is no Double-end Saw quotation or product specification in the supplied information. The product details available refer to an Edge Banding Machine with Pre-milling, Fine Trimming & Rounding. Its specifications, two-set minimum order quantity, and 30-day delivery time should not be assumed to apply to a Double-end Saw. Although the company’s general terms mention a one-set minimum order and a typical 20–35-day delivery period, ask the supplier to confirm the terms for the exact saw model.

Foshan Sun Hunt Woodworking Machinery Co., Ltd. describes quality checks that include inspecting parts, rechecking work during production, testing machines after assembly, and conducting a pre-shipment review. Its stated management process also covers sourcing, manufacturing, warehousing, packaging, quality control, shipment inspection, and after-sales service. These practices offer background on its operations but do not alter the payment arrangement.

The company also reports supplying woodworking production-line machinery to businesses in India and the UAE. One Indian wood door factory purchased 19 machines for a new line, and a wood-processing factory in the UAE purchased 10 machines. The information does not identify either project as a Double-end Saw order.

Payment and Order Information at a Glance

TopicInformation currently availableConfirm for your Double-end Saw order
T/T payment30% deposit, with 70% payable before loadingAgreed price, deposit due date, and payment milestones
Minimum orderOne set is listed in the company-wide business termsWhether this applies to the requested model and configuration
Delivery periodCompany-wide normal lead time is 20–35 daysSpecific production lead time and shipment date
Product detailsSupplied technical information describes an edge banding machineDouble-end Saw model, configuration, price, and applicable terms

Frequently Asked Questions

Is a 30% deposit reasonable for a Double-end Saw?

Thirty percent matches the T/T arrangement provided, with the remaining 70% due before loading. Since no separate Double-end Saw payment policy is stated, confirm the schedule and deposit trigger in the contract.

How do I calculate the deposit amount?

Multiply the agreed order value by 30%. The available information does not include a Double-end Saw price, so the exact currency amount cannot yet be determined.

Does the 30-day lead time apply to this saw?

No specific 30-day schedule is provided for a Double-end Saw; that figure belongs to the edge banding machine information. The company lists a general 20–35-day delivery window, which should also be verified for the specific order.

Recommendation

Use 30% of the agreed order value as the reference deposit and 70% as the pre-loading balance, then document the product configuration, price, deposit due date, and delivery schedule before production starts. The company lists T/T and sight L/C as payment options, and EXW, FOB, CIF, and DDP as delivery terms; confirm which are available for your transaction. For clarification, contact Vincent Guo at vincent@fsshmachine.cn.

About the Company

Foshan Sun Hunt Woodworking Machinery Co., Ltd. is based in Lunjiao, Shunde, Foshan, and develops and manufactures woodworking machinery. Its company profile describes three decades of industry experience and an in-house, seven-part management system spanning sourcing through after-sales service. The company reports annual capacity of 600 medium-sized machines and lists customers in the Middle East, North America, and Africa. It has also supplied production-line machinery to wood-processing businesses in India and the UAE.

Foshan Sun Hunt Woodworking Machinery Co., Ltd. logo