If Foshan Sun Hunt does not deliver the 45° Manual Sliding Table Saw within the agreed timeframe, the deposit should be dealt with according to the signed quotation, purchase order, sales contract, and any written delay provisions. The available terms require a 30% T/T deposit and a 70% balance before loading, but they do not provide an automatic refund, late-delivery penalty, or compensation arrangement. Do not alter the payment schedule without written confirmation.
The stated payment structure is 30% by T/T as the initial deposit, followed by 70% by T/T before loading. These terms explain when payment is due, but they do not specify the buyer’s rights if the factory misses the delivery deadline. As a result, the deposit cannot be assumed to be automatically refundable. Its treatment depends on the contractual terms accepted by both parties.
When a delay occurs, ask the factory to explain the cause and provide a revised completion date in writing. The buyer and supplier should then clarify whether the order will continue under a new schedule, be amended, or be cancelled under the contract. Any agreement involving deposit retention, a refund, compensation, cancellation, or a later balance-payment date should be documented and confirmed by both parties.
The 45° Manual Sliding Table Saw is specified with a 5.5 kW main saw motor, a 1.1 kW scoring saw motor, and a blade inclination range of 0–45°. Its maximum cutting length is listed as 2800–3200 mm, with a maximum cutting thickness of 80 mm. The product page indicates delivery within 15 days, while the company’s broader business information refers to a normal delivery period of 20–35 days for supported machinery and production-line projects. Confirm which timeframe applies to the specific sales order.
Foshan Sun Hunt states that it follows production-control and pre-shipment inspection procedures. Its described quality process includes precision adjustment and extended load testing before dispatch. The final inspection reportedly covers the machine, spare parts, consumables, tools, quantity, appearance, packaging, and shipping documents before container loading.
The company also reports experience in planning complete production lines. A wooden-door factory project in India included 19 machines, while a wood-processing project in the UAE included 10 machines. These examples demonstrate project-planning experience, but they do not create a specific contractual entitlement to a deposit refund or late-delivery compensation.
| Term | Information Provided |
|---|---|
| Initial deposit | 30% payable by T/T |
| Final payment | 70% payable by T/T before loading |
| Product-specific delivery time | 15 days for the 45° Manual Sliding Table Saw |
| General company delivery range | Normally 20–35 days |
| Refund or delay penalty | Not stated in the available information |
| Shipping method | By sea |
| Available trade terms | EXW, FOB, CIF, and DDP |
Compare the promised date in the signed contract with the quotation, purchase order, and product listing. Check whether the deadline is fixed or subject to production, customization, inspection, or shipping conditions.
Ask for the reason for the delay, the current production status, and a firm revised dispatch date. Keep all email, messaging, and payment records for reference.
Before agreeing to continue, postpone, or cancel the order, obtain written confirmation of how the deposit will be treated and whether the remaining 70% payment date will change.
Does a late delivery automatically mean the deposit must be refunded?
No. The available terms do not state an automatic refund. The buyer must rely on the signed agreement and obtain the factory’s written position regarding the deposit.
Can the factory still request the 70% balance before shipment?
The stated arrangement requires the balance before loading. If the original delivery date has passed, request a revised schedule and confirm whether the contract still requires payment at the original stage.
Which documents should be reviewed?
Review the quotation, purchase order, sales contract, payment receipts, product specifications, delivery commitment, shipping terms, and all written communications concerning the delay or deposit.
The available information confirms a 30% T/T deposit, a 70% balance payable before loading, and no stated automatic refund or late-delivery compensation policy. If the 45° Manual Sliding Table Saw is delayed, the safest approach is to follow the signed contract, obtain a revised schedule in writing, and document any agreement to continue, modify, or terminate the order. Foshan Sun Hunt also offers customized machinery and complete production-line solutions, with technical support and a one-year warranty subject to its stated exclusions. For technical assistance or project support, contact vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is based in Lunjiao Town, Shunde District, Foshan City, and manufactures woodworking equipment for varied processing applications. Founded in 2014, the company reports capacity of approximately 50 medium-sized machines per month and 600 machines per year. Its stated export markets include the Middle East, North America, and Africa. Its product portfolio covers CNC routers, double-end saws, planers, drilling machines, edge banding machines, and panel saws.

REPORT