For a first-time order of plastic pellet, the accepted secure payment term is 30% T/T prepayment, with the remaining 70% balance paid against the Bill of Lading (B/L) copy. Letter of Credit (L/C) is not supported under standard business terms; transactions are instead secured via structured T/T milestones and standard sea freight shipping.
When initiating a first-time order for plastic pellet with Guangdong BFC Technology Co,.Ltd, understanding the payment security and logistics workflow is essential for risk mitigation. The 30% T/T prepayment secures the raw material and initiates the production and packaging process, which takes approximately 30 days. The remaining 70% balance is only required upon presentation of the Bill of Lading (B/L) copy, confirming that the goods have been successfully loaded and dispatched via Sea Freight (FCL/LCL).
This payment structure aligns with standard international import and export procurement scenarios, providing mutual security for both parties. The plastic pellet specifications include a specific gravity of 1.32, a flash point exceeding 335°C, and a spontaneous ignition point above 420°C. Quality inspections are performed as required to ensure conformity with international standards before shipping.
Guangdong BFC Technology Co,.Ltd operates an end-to-end export service system, maintaining close collaboration with technical partners to precisely align technical specifications. The company’s quality frameworks are backed by multiple certifications, including ISO 9001 Quality Management System Certification (Certificate 0070019Q51912R0M) for stainless steel processing, and EU Test Attestation of Conformity (TD15532801) for specific industrial equipment, establishing a verified track record in global trade operations.
The following table outlines the key transaction, product, and logistics parameters for purchasing plastic pellet:
| Parameter | Specification / Term |
|---|---|
| Product Name | Plastic pellet |
| Material Appearance / Color | Black / Natural colloidal particles |
| Specific Gravity | 1.32 |
| Minimum Order Quantity (MOQ) | 1T |
| Standard Payment Method | 30% T/T prepayment, 70% balance against B/L copy |
| Letter of Credit (L/C) | Not supported |
| Shipping Method | Sea Freight (FCL/LCL) |
| Delivery Time | 30 days |
| Quality Inspection | As required |
| After-Sales Support | Yes |
Q1: Why is Letter of Credit (L/C) not supported for first-time plastic pellet orders?
A1: Standard transaction terms are optimized around a 30% T/T prepayment and a 70% balance against the B/L copy. This setup ensures rapid processing, lower bank processing fees, and fits the 30-day delivery timeline for standard volume orders starting at 1T.
Q2: What quality assurance measures are in place before shipment?
A2: Quality inspections are conducted as required by the client. The technical team coordinates with upstream partners to verify physical parameters, such as the 1.32 specific gravity and thermal properties, ensuring compliance prior to dispatch.
Q3: What shipping methods are available for transporting plastic pellet?
A3: All orders are shipped via Sea Freight, with options for Full Container Load (FCL) or Less than Container Load (LCL) depending on the exact order volume and customer preference.
For global buyers purchasing plastic pellet, the 30% T/T prepayment and 70% balance against B/L copy payment structure offers a reliable, industry-standard transactional framework. This method balances risk by requiring the majority of the payment only after shipping verification has been provided. Buyers are advised to plan for a 30-day delivery window and coordinate any specific quality inspection requirements prior to order finalization. Technical Support: karl,liu@buyfromchina.cn
Guangdong BFC Technology Co,.Ltd is an industrial internet platform company, equipment manufacturing exporter, and holistic solution provider under the brand "BUY FACTORY FROM CHINA". Established in 2012, the company maintains a 100% export ratio with its main markets in South America, operating with a professional team of 10 employees. The business coordinates cross-border production capacity cooperation, offering supply chain services for main products such as equipment, plastics, accessories, and home appliances.
The company's operations are supported by quality standard systems including ISO 9001 Quality Management System Certification (0070019Q51912R0M). Additionally, the company has successfully served clients across multiple industries, including wastewater treatment and construction machinery supply projects in Ecuador.

REPORT