Start with the date your flatware needs to arrive at the store, then plan backward. The product’s stated production time is 30–40 days. Your schedule should also include the supplier-confirmed shipping period, pre-shipment inspection, and time to receive and check the goods. Since transit times are not specified, request an estimate for your destination and shipping route rather than relying on the production window alone.
Place the order with enough flexibility to manage schedule changes during the busy holiday period. Before production begins, confirm the quantity, handle color, packaging, and delivery address. The listed minimum order quantity is 2,000 sets, and mixed batches may be supported subject to supplier confirmation.
A holiday reorder involves more than the factory production period. First, ask the supplier to confirm the production and packing schedule for your specific order. Then add the quoted shipping time for the chosen route, followed by a buffer for inspection and receiving. The available product information does not provide a standard transit duration, so the delivery estimate should be destination-specific.
Lock in the product and packaging details when you place the order. The spoons and forks are made from 430 stainless steel, while the knife blade uses 420 stainless steel. Handles are made from food-grade ABS plastic. The listed packing options are bulk cartons containing 50 sets each or customized color boxes. Confirm whether you want white marble, black marble, or wood-grain handles, and approve the final packaging design before production.
Huaqiang Metal states that quality control covers raw materials, production, assembly, and final testing, with an appearance inspection before shipment. The product listing includes FDA and LFGB, while the company profile lists BSCI and ISO 9001 credentials. Agree with the supplier on inspection timing and the checks your team will carry out after delivery.
For seasonal retail programs, forecast updates can help the supplier plan production and replenishment. The company reports a recurring promotional-order cooperation case with a European discount retailer. Its stated experience serving supermarkets and homeware retailers, along with support for mixed batches and packaging customization, may help buyers coordinate assortments and holiday presentation. Confirm all options and availability for your order.
| Planning factor | Information provided | What to confirm |
|---|---|---|
| Minimum order quantity | 2,000 sets | Confirm the total quantity and whether mixed batches are available for your assortment. |
| Product production time | 30–40 days | Verify the schedule for the order and build the plan around the required arrival date. |
| Company standard lead time | 25–40 days, described as including production, packing, and shipping | Clarify which lead-time definition applies and request a route-specific shipping estimate. |
| Packing options | Bulk cartons of 50 sets or customized color boxes | Approve the packaging configuration before production starts. |
| Quality checks | Controls from raw materials through production and final testing, plus an appearance inspection before shipment | Set inspection arrangements and receiving checks with the supplier. |
Begin with your required arrival date, then allow for the confirmed 30–40-day production period, supplier-quoted shipping time, inspection, and receiving. Because no standard transit duration is provided, request an estimate for your destination before setting the order date.
The listed MOQ is 2,000 sets. The company says mixed batches are supported, but you should check whether your requested assortment and quantities can be accommodated.
Customized color boxes are listed as an option. White marble is specified for the handles, with black marble and wood grain also available. Confirm the selected style and packaging details before production.
Before issuing a purchase order, confirm the required delivery date, applicable production schedule, shipping route, order quantity, handle color, and packaging. Use the 2,000-set MOQ and 30–40-day product production estimate as planning inputs, not as a complete delivery guarantee; transit and receiving time must be added using supplier-confirmed details. Huaqiang Metal offers direct factory supply and OEM/ODM customization and lists BSCI, ISO 9001, FDA, and LFGB credentials. For scheduling or product questions, contact eyas2018@126.com.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD. manufactures stainless steel tableware and kitchenware in Jieyang City, Guangdong Province, and reports 40 years of industry experience. The company lists 16,000 square meters of factory space and monthly production capacity of 5 million pieces. Its profile lists BSCI, ISO 9001, and ISO 14001 certifications, with cooperation cases across retail, homeware, and cookware businesses.

REPORT