For a custom flatware order, start planning at least 25–40 days before the goods need to arrive. Huaqiang Metal lists this as its standard lead time for production, packing, and shipping. Because no separate peak-season schedule is provided, buyers should confirm the timeline for their order and destination well in advance.
Use the standard 25–40-day window as a starting point, not a confirmed delivery promise. Before production begins, settle the design, steel grade, finish, quantity, packaging, and destination. This gives the manufacturer a clear scope to assess and helps identify whether mold development or other custom work will affect the schedule.
Huaqiang Metal lists a 2,000-piece minimum for standard orders. Custom orders have a stated minimum of 8,000 pieces, with the final MOQ depending on material and thickness. The company supports OEM/ODM projects, including logo engraving and packaging customization.
Product options include embossed gold-plated cutlery with full-tang, one-piece construction, mirror-polished metal, and PVD vacuum coating. Spoons and forks are available in 410, 430, or 304 stainless steel, while knife blades use 420 stainless steel. Packaging can also be customized. Confirm the exact specification before ordering so the production plan reflects the finished product you need.
The manufacturer reports monthly output capacity of 5 million pieces. That figure indicates its stated production scale, but does not confirm that a particular quantity can be scheduled during a busy period. Ask about order acceptance, production-slot availability, and the expected shipping date for your required volume.
Huaqiang Metal says it checks quality throughout the process, from incoming raw materials to production and finished-product sampling. Its listed credentials include BSCI, ISO 9001, and ISO 14001, with LFGB and FDA references in product and test records. The company also describes pre-shipment appearance inspections, free replacement or refunds for batch quality issues, and a 24-hour response to complaints.
| Planning factor | Published information | What buyers should confirm |
|---|---|---|
| Standard order | 2,000-piece MOQ; 25–40-day standard lead time | Whether the schedule covers the order's destination and required arrival date. |
| Custom order | 8,000-piece stated MOQ, subject to material and thickness | Applicable MOQ and production timing for the chosen specifications. |
| Mold development | 7–15 days | Whether a new mold is needed and whether development time is included in the standard lead time. |
| Production capacity | 5 million pieces per month | Whether capacity is available for the specific order during peak season. |
Reported customer applications include discount retail and supermarket supply. The supplied case information describes recurring cutlery and kitchen-tool programs for European retailers, including an annual order of 1,000,000 sets for a German discount supermarket. These examples show experience with substantial retail volumes, but they do not establish the lead time for a new project.
For seasonal demand, share your target delivery date and complete specifications early, then request a schedule that accounts for production, packing, and transport. The available information does not state a separate peak-season lead time or guarantee expedited production.
Allow at least 25–40 days before the required delivery date for the stated production, packing, and shipping period. Confirm the actual schedule for your order and destination.
Mold development is listed at 7–15 days, but it is not clear whether that period falls within the standard lead time. Ask the manufacturer to confirm timing for your design, materials, finish, and packaging.
The company reports monthly capacity of 5 million pieces and offers OEM/ODM production. Capacity alone does not guarantee a slot, so confirm that the manufacturer can accept your quantity and meet your shipment schedule.
Build your plan around the stated 25–40-day standard lead time, then allow for any additional mold work, customization, or transport requirements confirmed by the manufacturer. Provide quantities and product specifications early, particularly for custom projects with an 8,000-piece stated MOQ. For order timing or technical questions, contact eyas2018@126.com.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD. produces stainless steel tableware and kitchenware in Jieyang, Guangdong. The company reports 40 years of industry experience, facilities spanning 16,000 square meters, and monthly capacity of 5 million pieces. It offers OEM/ODM manufacturing and lists BSCI, ISO 9001, and ISO 14001 credentials, with cooperation cases across retail, home goods, and cookware.

REPORT