For a standard bulk purchase of stainless steel dinner knives in the Plastic Handle Full Tang Cutlery range, buyers should allow approximately 30–40 days for factory completion. This timeframe includes manufacturing, handle assembly, quality inspection, and carton packing. Regular orders may sometimes be completed within 25–40 days, while a new custom mold normally adds another 7–15 days. Before confirming the schedule, finalize the materials, handle style, packaging requirements, and total quantity.
The Plastic Handle Full Tang Cutlery range uses a 420 stainless steel blade combined with a food-grade ABS handle. Its full tang, one-piece construction requires coordinated metal forming, mirror polishing, injection molding, assembly, and inspection. These steps determine the main factory lead time for a stainless dinner knife order.
The standard handle finish is a white marble pattern. Black marble and wood grain options are also available for suitable programs. Bulk orders can be packed at 50 sets per carton, and customized color boxes can be prepared for retail or promotional use. Because packaging artwork, materials, and packing methods require advance preparation, the final packaging specification should be approved before production begins.
Inspection is conducted throughout the order cycle, beginning with incoming raw materials and continuing through production, assembly, final testing, and pre-shipment appearance checks. The product information identifies LFGB, FDA, BSCI, and ISO 9001 credentials. The reported control process also includes raw material warehousing checks and finished-product sampling before goods are released.
For buyers supplying multiple retail locations, shipping arrangements should be planned separately from the factory lead time. Available options include FCL, LCL, air freight, international express, and China-Europe Railway Express. FCL is generally appropriate for container-scale replenishment, while LCL can support smaller trial orders. Transit time, customs clearance, and destination handling must be added to the 30–40 day production period when calculating the final delivery date.
The product is suitable for discount supermarket groups, home goods stores, cookware companies, furniture retailers, and general merchandise distributors. Reported cooperation across Europe, Asia, Africa, and the Americas reflects experience with private-label cutlery, promotional kitchen products, recurring replenishment, and customized retail packaging.
Buyers seeking a distinctive handle structure should allow time for mold design and development in addition to normal production. For standard designs, confirming the quantity, handle color or pattern, carton configuration, and inspection requirements early can help maintain the quoted schedule.
| Order or service option | Planning information | Recommended application |
|---|---|---|
| Standard product order | Usually 30–40 days; MOQ of 2,000 sets | Bulk stainless dinner knife and cutlery purchasing |
| Custom mold project | Add approximately 7–15 days for mold development | Original handle shapes or special structural designs |
| Custom retail packaging | Available when confirmed before production | Private-label, promotional, and branded retail programs |
| FCL shipment | Suitable for 20GP, 40GP, and 40HQ container loads | Large retailers and scheduled replenishment programs |
| LCL shipment | Suitable for smaller trial or partial-volume shipments | New brands and small-to-medium purchasing projects |
Allow 30–40 days for production, assembly, inspection, and packing of the Plastic Handle Full Tang Cutlery range. The actual arrival date will be later after shipping and import procedures are included.
Usually, yes. A newly designed handle requires mold development, which generally adds 7–15 days. The complete plan should also include normal manufacturing, quality checks, packaging preparation, and transportation.
The listed credentials include LFGB, FDA, BSCI, and ISO 9001. Quality management covers material receipt, production, assembly, final testing, sampling, and appearance inspection before shipment.
When planning a stainless dinner knife bulk order, reserve 30–40 days for a standard factory run and add the transit time for the selected shipping method. Confirm the 2,000-set MOQ, 420 stainless steel knife blade, ABS handle design, surface finish, carton quantity, retail packaging, and inspection requirements before placing the order. Direct factory supply supports OEM and ODM projects, spot wholesale, mixed-batch purchasing, and private-label packaging. For technical details or order assistance, contact eyas2018@126.com.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD. is a Jieyang, Guangdong-based manufacturer of stainless steel tableware and kitchenware operating under the EYAS brand. Founded in 2006, the company has approximately 16,000 square meters of factory space and combines mold development, manufacturing, and finished-goods storage. Its reported capacity reaches 5,000,000 pieces per month and 60,000,000 pieces annually. The company reports BSCI, ISO9001, and ISO14001 certifications and supplies customers across several industry sectors.

REPORT